Skip to content

Fire-rated penetrations & joints

Fire Caulking

Fire-rated caulking is a certified system, not a product — the seal is only compliant when the substrate, penetration type and installation method match a tested assembly. We identify the correct system for the penetration and FRL required, install strictly to the tested detail, and tag and document every penetration for certification.

  • Penetrations
  • Head-of-Wall
  • Intertenancy
  • Compliance Docs

Scope

What's included

  • Service penetration sealing
  • Head-of-wall and intertenancy joints
  • Fire-rated construction and control joints
  • Installation to tested and certified systems
  • Penetration tagging and register
  • Documentation pack for the building certifier

Fire-rated joints are engineered systems, not just a bead of sealant — they need to meet the fire resistance requirements set out in the National Construction Code and the relevant Australian Standards for the assembly they're part of. We treat every penetration and control joint that way: identified, prepped, and sealed to hold its rating, with the documentation to back it up if a certifier asks.

Questions

Fire Caulking — common questions

Can you certify the work?

We install to tested systems and provide the installation documentation and penetration register. Final certification is issued by the building certifier or fire safety practitioner on the project.

Why does the system matter more than the product?

A fire rating is achieved by a tested assembly — substrate, penetration, backing and sealant together. Using the right sealant in the wrong configuration does not carry the rating.

What documentation do we get for handover?

A penetration register with location references, plus product data sheets for the systems used. It’s built to slot straight into the project’s compliance file.

Do you work on commercial and multi-residential sites?

Yes — fire-rated caulking mostly comes up on commercial and multi-residential jobs, where service penetrations and control joints need to hold a fire rating for the building to pass certification. We scope it the same way regardless of size: identify what needs to be rated, seal it properly, and leave the paper trail.

Get pricing

Price your fire caulking scope

Send the project details and we'll come back with pricing — usually the same day.

Step 1 of 4

About you

Who are we quoting for?
  • No obligation
  • Usually answered the same day
  • 12-month workmanship warranty

Prefer to just ask a quick question? Get in touch instead.

Need a caulking sub who turns up?

Send the project details and we’ll come back with pricing — usually the same day.

Call nowGet pricing